Savin Engineers performed detailed structural design associated with a new 6,000 square foot On-Site Hypochlorite Generation (OSHG) Facility at both Bay Park
Sewage Treatment Plant and Cedar Creek Water Pollution Control Plant.
Structural design included a pile-supported reinforced concrete foundation with a preengineered metal building superstructure to house various process equipment, storage tanks, and electrical equipment. Design accounted for flood protection measures utilizing reinforced concrete buttress walls to elevate all essential equipment above the design flood elevation.
All design was in accordance with the latest provisions of ASCE-7, New York State Building Code, ACI and AISC.